Category: | Cycleway: A problem that needs to be fixed |
Tags: | None |
Date time: | 11.09am, Friday 13th May, 2011 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | spokesgroup |
Copyright: | Public domain |
Download: | View full-size original |
Area: | Watford |
A proper crossing has been provided here, but cyclists are forced to do a tight right turn through a narrow kerbed channel (which is full of debris). Cyclists often go to the right of the island which puts them at risk of a head-on collision with a vehicle exiting the Royal Mail complex.
Opportunities for improvement: redesign the junction with a smoother flow for cyclists. Give priority to cyclists and pedestrians in this area using raised areas.
Comments reflect the views of the original submitter only.